Final inspection:

Final lineament inspections are the terminal activity which performed before shipment. After consummate the pre-last or lot give-up the ghost inspection, this variety of inspection procedure commonly coordinated by final inspector earlier the shipment, it’sec called last inspection. It is as well known every bit pre-shipment inspection.

After packing in addition to cartooning is over, all the items comprising a consignment fix for shipment is as well called a lot or population on which statistical method can be successfully used. Any sample randomly taken from such a lot tin can stand for the whole lot.

  are the last activity which performed before shipment Final Inspection Process in Apparel Industry
Fig: Final inspection inward garments manufacture

Pre-shipment or last inspection is more often than not organized by buyer’sec representative. This inspection process mainly held on the dress manufactory. If reject charge per unit is higher than a pre-set up value the whole lot is rejected or returned for recheck.

To become high lineament and defect less garment, to go correct mensuration, perfect finishing, as well as the accuracy of terminal inspection, apparel manufacturer take to maintain a sequence of unlike steps is equally follows. It is besides used as a sequence of terminal inspection of garments shipment lot.

Activities to live performed during terminal inspection are as follows:

one
 
Verifying Packing list comparison with P.O. sail
two
 
Determining of lot size
iii
 
Selecting of inspection severity level & sampling plan
iv
 
Preparation of Inspection
v
 
Checking of carton
six
 
Selection of carton
7
 
Checking of Packing  & packaging
eight
 
Selection of sample randomly (sample packing)
9
 
Checking of garments Sample
x
 
Checking of measure (Dimension)
eleven
 
Record as well as listing all of the major or nipper defects/defectives/not conformances
12
 
Tabulation together with evaluation of results from this tape
13
 
Drawing of defective sample for reference
fourteen
 
Filling upward of Carton (If samples are ok)
fifteen
 
Putting of Sticker & signature on carton
16
Preparation of Report
17   
Conformation for the shipment

  • Share