Importance Of Production Planning In Addition To Command Inward Garment Manufacture

  • Share
Production or manufacturing is a process of converting raw materials into semi-finished or finished products together with thereby value of utility is added to the products which tin be measured from the deviation betwixt the value of inputs as well as the value of the outputs. Production planning as well as command (PPC) is a systematic approach of planning as well as command of the manufacturing activities of an system to reach the desired goals.

Necessity of production planning and control (PPC) in wearing apparel industry:

Every product organization requires systematic approach to accomplish its finish of production. Consequently, it brings forth the necessity of coordination and proper execution of product planning as well as command. Production planning together with command (PPC) are important aspects of the garment manufacturing manufacture. Precision inward planning equates to on-fourth dimension shipments, the best function of labor, in addition to assurances that appropriate supplies and equipment are available for each guild. Production planning involves everything from scheduling each job inward the process to execution in addition to delivery of products. In nearly cases the product of garments is rattling fourth dimension sensitive inward lodge to send goods to stores in addition to boutiques for the upcoming flavour. In the context of apparel manufacturing, rule importance of the PPC department are listed below.

Production or  manufacturing is a process of converting raw materials into  semi Importance of Production Planning and Control in Garment Industry
Fig: PPC inwards garment manufacturing manufacture
ane. Job or job scheduling: 

This requires grooming of time together with an activeness calendar for each social club from order receiving to shipment. The chore schedule contains a list of tasks to live processed for the styles. Each chore planner notes when to first a task and the deadline for that chore. The refer of the responsible individual (section) for the chore is listed, for example, scheduling planned cutting appointment as well as job loading engagement.

two. Material resource planning (inventory):

Preparation of a material requirement canvass according to sample product and buyer specification sheet is necessary. Consumption of garment accessories (e.g. cloth, thread, button, and twill tape) is calculated together with price of each textile is estimated.

3. Facility place:

Where a company has multiple factories (facilities) for production in addition to factories are set for a specific production, the planner must place which facility will be about suitable for new orders. Sometimes at that place may live a capacity shortage inward a factory; inward that instance the planner must determine which facility will live selected for those orders.

four. Patterns together with markers:

Pattern making, grading, as well as markers are a crucial role inwards planning for production. Once markers of each fashion are finalized, ane can easily calculate the yield of textile needed for product and inward plough can society the material. When planning for the production schedule i must speak to the fabric supplier near the turnaround of the fabric in addition to whatsoever additional time needed for dyeing or washing the cloth.

5. Estimating quantity in addition to costs of product:

The planner estimates daily product (units) according to the styles’ go content. With the estimated product figure, product runs, as well as manpower involved, the planner likewise estimates production toll per piece.

six. Capacity planning:
The PPC departments play a major part during club booking. They make up one’s mind (propose) how much lodge they should accept according to their product capacity, that is, allocating of full capacity or deciding how much capacity to live used for an lodge out of the total manufacturing plant capacity.

7. Line planning:

Influenza A virus subtype H5N1 detailed line of work planning amongst daily product targets for the production line is prepared. In well-nigh cases line of work planning is made afterwards discussions amongst the production squad together with industrial engineers.

viii. Cost command:

Garment manufacturers cannot afford to lose fourth dimension or materials inwards the production process. Raw material prices ascent consistently, too hapless planning can atomic number 82 to missed opportunities together with higher costs. With styles changing quickly as well as vendors making increasingly smaller orders to keep upward amongst changing trends, the planning stage of each product piece must be every bit accurate as possible.

nine. Reduce loss:

About threescorelxx% of the cost of a garment is in the material. As such, it is vital that ane orders appropriately in addition to tracks the cut room processes to proceed errors to a minimum. Effective production planning relies on the power to club the appropriate sum of textile for a go too to realize no more than than a ii-3% rate of fault in cutting. That means that the issue of garment components produced should equal 97-98% of the garment components cutting.

ten. Deliver timely shipments:

Early delivery tin can be every bit harmful to the companionship’second future equally late delivery, because buyers then must adapt early on deliveries alongside additional storage capacity. Ideally, the planning should let for exact delivery when the client demands. At the same time, there must live sufficient project too raw cloth delivery inwards the exact proportions to see the deadlines without having to pay extra for overtime.

11. Follow-upwardly daily:

Once the plans are gear up for a garment operate and delivery deadlines, 1 must plant strict follow-up procedures to ensure that the design is followed correctly. If the cutting room, for example, falls behind inwards its production schedule, and so the sewing in addition to finishing lines must expect, leading to backlogs in addition to missed delivery deadlines for shipment. To avoid this, ane must accept a daily oversight of each stride together with go along the residual of the job updated alongside whatsoever delays and then that plans can be adjusted to pick upward the slack.

The primary use of PPC is to effectively employ limited resources; inward other words to increment productivity. If machines or operators are idle because there is no go or if parts remain in inventory because a car is non available, so resources are being wasted.

The office of PPC is to trim down this waste material past intelligently coordinating the availability of operator, equipments too material. Often, at that place are conflicting objectives of product, sales, too finance. The part of PPC action is to interpret the conflicting objectives as well as and so to reconcile them into coherent production plans together with inventory policies. The objectives of product planning and control inward dress manufacture thus should be the objective of the total society or arrangement.